Quadrant East Campus Corporate Park Parcel 4
Project:
-
65,000 ft2 2-story Building
Site Location:
-
Federal Way, WA
Team:
-
Owner - Quadrant Corporation
-
Architect - Lance Mueller and Associates
-
GC - GLY Construction Co.
-
HVAC - PSF Mechanical, Inc.
-
Electrical - Johnson Electric
-
Fire Protection - Patriot Fire Protection
Major Tenants:
-
Safeco
-
Tesoro
-
National Semiconductor
-
Robert Half
HVAC Systems:
-
Standard temperature VAV systems utilizing two Trane rooftop Intellipak VAV units
-
Series fan induction terminal with VAV and electric heat
-
Series type VAV boxes with silent mercury contactors
-
Central toliet exhaust system utilizing a rooftop fan
-
Raised curb sound attenuating system for roof units
-
100% airside economizers
-
Farr 30% pleated filters
Energy Saving Strategies:
-
Efficient scroll compressors
-
Premium efficiency supply and relief fan motors
-
VAV supply and relief fans for the Trane Intellipak units result: both energy savings and accurate control of duct and building static pressure
- Gas heating is used for nighttime heating and morning warm-up; reducing the use of electric energy