jump to home page

Quadrant Lot 11 - Catapult

Project:

  • 63,000 ft2 2-story Build-to-suit

Site Location:

  • Bothell, WA

Team:

  • Owner - Quadrant Corporation
  • Architect - Lance Mueller & Associates
  • GC - GLY Construction Co.
  • HVAC - PSF Mechanical, Inc.
  • Electrical - Johnson Electric
  • Fire Protection - Patriot Fire Protection
  • Structural - Engineers NW

HVAC Systems:

  • Standard temperature variable air volume
  • Trane high efficiency rooftop intellipaks
  • Trane series VAV fan powered terminals
  • 5.0 W/ft2 distributed miscellaneous equipment load capacity

Energy Saving Strategies:

  • Efficient scroll compressors
  • Premium efficiency motors
  • VAV supply and relief fan
  • Gas heating is used for nighttime heating and morning warm-up, reducing the use of electric energy
  • Trane Summit integrated comfort system