Quadrant Monte Villa Lots 19 & 20
Project:
-
46,000 ft2 2-story Building
Site Location:
-
Bothell, WA
Team:
-
Owner - Quadrant Corporation
-
Architect - Lance Mueller & Associates
-
GC - GLY Construction Co.
-
HVAC - PSF Mechanical, Inc.
-
Electrical - Johnson Electric
- Fire Protection - Patriot Fire Protection
Major Tenants:
-
Humongous
- W & H Pacific
HVAC Systems:
-
Standard temperature VAV systems utilizing one Trane "high capacity" 115 ton rooftop Intellipak VAV units
-
Series type VAV terminal boxes with silent mercury contactors, terminal boxes use electric heat
-
Communicating electronic direct digital controls system with off-site monitoring capability, (Trane Tracer Summit)
-
Central toilet exhaust systems utilizing rooftop centrifugal fan
-
Raised curb sound attenuating system at rooftop units
-
100% airside economizer
- Farr 30% pleated filters
Energy Saving Strategies:
-
Efficient scroll compressors
-
Premium efficiency supply and relief fan motors
-
VAV supply and relief fans for the Trane Intellipak units result in energy savings
- Gas heating is used for nighttime heating and morning warm-up, reducing the use of electric energy


