jump to home page

Quadrant Monte Villa Lots 19 & 20

Project:

  • 46,000 ft2 2-story Building

Site Location:

  • Bothell, WA

Team:

  • Owner - Quadrant Corporation
  • Architect - Lance Mueller & Associates
  • GC - GLY Construction Co.
  • HVAC - PSF Mechanical, Inc.
  • Electrical - Johnson Electric
  • Fire Protection - Patriot Fire Protection

Major Tenants:

  • Humongous
  • W & H Pacific

HVAC Systems:

  • Standard temperature VAV systems utilizing one Trane "high capacity" 115 ton rooftop Intellipak VAV units
  • Series type VAV terminal boxes with silent mercury contactors, terminal boxes use electric heat
  • Communicating electronic direct digital controls system with off-site monitoring capability, (Trane Tracer Summit)
  • Central toilet exhaust systems utilizing rooftop centrifugal fan
  • Raised curb sound attenuating system at rooftop units
  • 100% airside economizer
  • Farr 30% pleated filters

Energy Saving Strategies:

  • Efficient scroll compressors
  • Premium efficiency supply and relief fan motors
  • VAV supply and relief fans for the Trane Intellipak units result in energy savings
  • Gas heating is used for nighttime heating and morning warm-up, reducing the use of electric energy