RidgePointe Office Building
Project:
-
50,790 ft2 3-story Tech-Flex Facility
-
33,860 ft2 2-story Parking Garage
Site Location:
-
Bellevue, WA
Team:
-
Owner - Metzler North America
-
Architect - Baylis Architects
-
GC - Baugh Construction
-
HVAC - PSF Mechanical, Inc.
HVAC Systems:
-
Office - standard temperature variable air volume (VAV) systems utilizing two Aaon Twinned rooftop units
-
Nailor series and shut-off type VAV terminal boxes, fan powered terminal boxes use electric heat for the perimeter and second floor; first and second floor interior office areas have VAV shut-off type
-
Communicating electronic direct digital controls system (LonWorks/Echelon)
-
Central toilet exhaust systems utilizing quiet utility-set type rooftop centrifugal fans
-
Raised curb sound attenuating system at rooftop units
-
100% airside economizers
-
Efficient pleated filters
-
The parking garage utilizes multiple enclosed prop type exhaust fans placed at strategic perimeter locations
Energy Saving Strategies:
-
Variable speed (inverter) driven supply fans for Aaon Twinned units result in both energy savings and very accurate control of duct static pressure
-
Premium efficiency motors used throughout
-
Direct digital controls provide accurate temperature control, minimizing drift and overshoot
-
100% modulating airside economizers
- High efficiency scroll compressors
System Benefits/Goals:
The HVAC systems designed for RidgePointe Office building represents state-of-the-art design relative to efficiency, indoor air quality and comfort.


