Yarrow Bay Marina Suites
Project:
-
54,500 ft2 3-story Office Building
-
63,000 ft2 Underground Parking Garage
- 5,700 ft2, Service Building
Site Location:
-
Kirkland, WA
Team:
-
Owner - Waterfront Construction
-
Architect - Collins Woerman
-
GC - GLY Construction
-
HVAC - PSF Mechanical, Inc.
-
Electrical - VECA Electric
- Fire Protection - Patriot Fire Protection
HVAC Systems:
-
Floor-by-floor vertical self-contained VAV units
-
Control VAV using water-cooled floor-by-floor units on floors 1 & 2
-
Closed circuit condenser water system
-
Air-side economizers
-
FANWALL TECHNOLOGY® building relief system
-
Mechanical garage exhaust
-
Series fan-powered terminal boxes
Energy Saving Strategies:
-
High efficiency HVAC units with VFDs and water cooled condensers
-
VFD driven FANWALL exhaust systems (floor-by-floor)
-
VFD driven garage exhaust fans
-
DDC energy management control system
-
Carbon Monoxide sensors for control of exhaust fans
-
Variable frequency drives for fans and pumps
System Benefits/Goals:
-
Floor-by-floor mechanical system with below-grade fluid coolers preserves neighbor water views by eliminating rooftop mechanical equipment and screens
-
Closed circuit fluid cooler reduces system maintenance requirements and maintains system efficiency over time
-
Variable frequency drives are used on pumps and fans for maxium efficiency and accurate control of pressures and temperatures
-
Series fan terminals eliminate stratification, improving comfort and efficiency
Unique Design Challenges:
-
No equipment allowed on roof