Washington Education Association Northlake Building
Project:
-
60,630 ft2 2-story Building
Site Location:
-
Federal Way, WA
Team:
-
Owner - Washington Education Association
-
Architect - (shell) - Collins Woerman
-
Architect - (TI) - BLR & B
-
GC - GLY Construction
-
HVAC - PSF Mechanical, Inc.
-
Electrical - Johnson Electric, Inc.
- Fire Protection - Patriot Fire Protection
HVAC Systems:
-
Standard temperature variable air volume systems utilizing two Trane Intellipak units at 75 and 55 tons for office spaces, 40 ton AAON unit for assembly, dining and conference rooms
-
Series fan powered VAV terminals with electric heat
- Trane Summit DDC EMCS
Energy Saving Strategies:
-
VFD’s on supply and relief fans
-
Premium efficiency motor
-
DDC controls
-
"Off-schedule" areas served by independent VAV system
- Series VAV fan terminals used to eliminate stratification, temperature functions


