jump to home page

Childhaven

Project:

  • 53,700 ft2 Four-story Facility Plus Underground Parking Garage

Site Location:

  • Seattle, WA

Team:

  • Owner - Childhaven
  • Architect - Miller/Hull Partnership
  • GC - GLY Construction
  • HVAC - PSF Mechanical, Inc.
  • Electrical - Johnson Electric
  • Fire Protection - Patriot Fire Protection

HVAC Systems:

  • Two packaged York rooftop VAV variable air volume units with gas heat
  • Fan powered terminal units with electric heat
  • Type I and Type II kitchen exhaust hoods
  • Server room split system
  • Packaged heat pumps serving elevator machine rooms
  • Elevator pressurization fans
  • Garage exhaust system
  • Alerton EMCS system

Energy Saving Strategies:

  • EMCS optimal start scheduling of HVAC equipment
  • High-efficiency HVAC equipment with gas heat
  • ECM motors on terminal units
  • Economizer control of rooftop units to provide “free” cooling with outside air
  • VFDs on rooftop unit supply fans

System Benefits/Goals:

The Childhaven facility was constructed under the design/build concept which proved very beneficial to the owner by delivering a complex mixed-occupancy structure under a tight schedule. Severe space constraints due to height limits proved a challenge to the mechanical designer/installers. Special consideration was given to sound control which produced a quiet building both internally, and due to code restrictions, externally.