jump to home page

Quadrant Monte Villa - Lot 6

Team:

  • Owner - Quadrant Corporation
  • Architect - Lance Mueller & Associates
  • General Co. - GLY Construction Co
  • HVAC - PSF Mechanical, Inc.
  • Electrical - Johnson Electric
  • Fire Protection - Patriot Fire Protection
  • Plumbing - Stirrett Johnsen

HVAC Systems:

  • Standard temperature VAV systems utilizing one Trane “high capacity” 115 ton rooftop Intellipak VAV units
  • Series type VAV terminal boxes with silent mercury contactors. Terminal boxes use electric heat
  • Landis & Staefa DDC controls with off-site monitoring capability
  • Sized for “high-tech” tenants, 3.0 watts per ft2 miscellaneous equipment load

Energy Saving Strategies:

  • Efficient scroll compressors
  • Premium efficiency supply and relief fan motors
  • VAV supply and relief fans for the Trane Intellipak units result in energy savings
  • Gas heating is used for nighttime heating and morning warm-up, reducing the use of electric energy

Project:

  • 42,780 ft2 2-story building
  • High-tech/flex building

Site Location:

  • Bothell, WA

Major Tenants:

  • Motorola
  • Pacific Aerospace and Electronics