jump to home page

Quadrant I-5 Building B

Team:

  • Owner - Quadrant Corporation
  • Architect - Lance Mueller & Associates
  • General Co. - GLY Construction Co
  • HVAC - PSF Mechanical, Inc.
  • Electrical - Johnson Electric
  • Fire Protection - Patriot Fire Protection Inc.

HVAC Systems:

  • Standard temperature variable air volume
  • Series fan induction terminal with VAV and electric
  • Series type VAV boxes with silent mercury contacts
  • Communicating electronic direct digital controls system with off-site monitoring capability
  • Central toilet exhaust system utilizing a rooftop fan
  • Raised curb sound attenuating system for roof units
  • 100% airside economizers
  • Farr 30% pleated filters

Energy Saving Strategies:

  • Efficient scroll compressors
  • Premium efficiency supply and relief fan motors
  • Variable frequency inverter drives for supply fans to maximize the benefits of reduced fan current draw
  • Direct digital controls provide accurate temperature control, minimizing drift and overshoot

Project:

  • 71,000 ft2 2-story building

Site Location:

  • Everett, WA