Lakemont Professional Building
Project:
-
24,200 ft2 2-story Office Building
-
One-level Parking Garage
Site Location:
- Bellevue, WA
Team:
-
Owner - Barclay Dean
-
Architect - Whiteley Jacobsen and Associates
-
GC - Barclay Dean
-
HVAC - PSF Mechanical, Inc.
-
Electrical - Independant Electrical
-
Fire Protection - Smith Fire Systems
Major Tenants:
-
Barclay Dean
-
Inficom
-
U.S.N.W
HVAC Systems :
-
Standard temperature VAV system utilizing (1) Trane 40 ton packaged Voyager VAV Unit
-
Series fan powered VAV boxes with silent mercury contactors (Terminal boxes use electric heat)
-
Dedicated toilet exhaust fans ducted out sidewall, interlocked with restroom light switch including time delay relay
-
100% airside economizers
Energy Saving Strategies:
- Efficient scroll compressors
-
High efficiency supply fan motors
-
Direct digital controls provide accurate temperature control, minimizing drift and overshoot
System Benefit/Goals:
100% airside economizers are used for maximum cooling efficiency: the system will only operate in its ‘minimum outside air mode’ (20 CFM/person at 1 person/150 ft2) when outside ambient temperatures exceed 76o to 78oF. At ambient temperatures below 76o to 78oF and above 55oF the system operates on 100% outside air. At temperatures below 55oF the system will mix outside air with return air to maintain a discharge temperature of 55oF.


