Lakemont Professional Building

Project:

  • 24,200 ft2 2-story Office Building
  • One-level Parking Garage

Site Location:

  • Bellevue, WA

Team:

  • Owner - Barclay Dean
  • Architect - Whiteley Jacobsen and Associates
  • GC - Barclay Dean
  • HVAC - PSF Mechanical, Inc.
  • Electrical - Independant Electrical
  • Fire Protection - Smith Fire Systems

Major Tenants:

  • Barclay Dean
  • Inficom
  • U.S.N.W

HVAC Systems :

  • Standard temperature VAV system utilizing (1) Trane 40 ton packaged Voyager VAV Unit
  • Series fan powered VAV boxes with silent mercury contactors (Terminal boxes use electric heat)
  • Dedicated toilet exhaust fans ducted out sidewall, interlocked with restroom light switch including time delay relay
  • 100% airside economizers

Energy Saving Strategies:

  • Efficient scroll compressors
  • High efficiency supply fan motors
  • Direct digital controls provide accurate temperature control, minimizing drift and overshoot

System Benefit/Goals:

100% airside economizers are used for maximum cooling efficiency: the system will only operate in its ‘minimum outside air mode’ (20 CFM/person at 1 person/150 ft2) when outside ambient temperatures exceed 76o to 78oF. At ambient temperatures below 76o to 78oF and above 55oF the system operates on 100% outside air. At temperatures below 55oF the system will mix outside air with return air to maintain a discharge temperature of 55oF.