jump to home page

Redmond Software Campus, Building 86

Project:

  • 200,000 ft2 Office Space
  • 2-story Tenant Improvement

Site Location:

  • Redmond, WA

Team:

  • Construction Manager - Olympic Associates
  • Architect - NBBJ
  • GC - Sellen Construction Company
  • HVAC, design/build - PSF Mechanical, Inc.

HVAC Systems:

  • Rooftop chilled water VAV AHU’s
  • Stand-alone rooftop AC Units
  • Series Fan Terminal Units with electric heat
  • Siemens BAS

Energy Saving Strategies:

  • High efficiency Fan Motors with VFD’s
  • ECM motors on terminal units
  • Economizer controls on RTU’s to provide "free" cooling with outside air
  • Discharge temperature reset: balances energy efficiency and comfort

System Benefit/Goals::

  • Dedicated Cable Room cooling units with redundant VAV backup
  • 100% modulating airside economizers
  • DDC provides accurate temperature control, minimizing drift and over-cooling
  • Series terminal units provide the comfort of constant volume with the efficiency of VAV