Nintendo Totem Lake Operations Center
Project:
-
126,662 ft2, 2-story Office & Distribution Warehouse
- Existing building retrofit, add to and modify existing mechanical systems to accomodate load in a secure facility
Site Location:
- Kirkland, WA
Team:
-
GC - GLY Construction
-
Architect - Lance Mueller & Associates
-
HVAC - PSF Mechanical, Inc.
-
Electric - Holmes Electric
Tenant:
-
Nintendo of America
-Customer Service Group
-Quality Control Group
Scope:
-
Convert warehouse to offices, cafeteria, security, training, customer and technical services plus establish a product quality control room within the technical services area
HVAC Systems:
-
Conventional packaged rooftop with air-side economizers
-
Programmable set-back controls with adaptive optimal start
Energy Saving Strategies:
-
Natural gas heating systems - low carbon emissions
-
Programmable controls allow for variable schedules and occupants
-
Adaptive optimal start controls allow most efficient warm-up cycle during heating season
System Benefits/Goals:
-
Low-cost simple system with minimal structural impact on existing lightweight roof structure
Design Challenges:
-
Lightweight roof structure required a distributed HVAC system
-
Fast track schedule demanded quick turnaround on procurement, immediate submission for permitting
-
Significant seasonal variability in occupant rates required flexible system layout capacity control and discrete zoning