Puget Sound Energy Tenant Improvement
Project:
-
100,000 ft2 Tenant Improvement of floors 8-12 in the PSE Building
Site Location:
-
Bellevue, WA
Team:
-
GC - Lydig Construction
- HVAC - PSF Mechanical, Inc.
HVAC Systems:
-
Medium temperature variable air volume (VAV) systems utilizing two rooftop units
-
Series type VAV terminal boxes with silent mercury contactors; terminal boxes use electric heat at all perimeter
-
Communicating electronic direct digital controls system
-
Central toilet exhaust systems utilizing quiet utility-set type rooftop centrifugal fans
-
Raised curb sound attenuating system at rooftop units
-
Water cooled Liebert Units were used to cool the IT room
-
Water source Mammoth Heat Pumps were used to cool the communications room
Energy Saving Strategies:
-
ECM motors on the Nailor Fit Boxes
-
Waterside economizers were provided with the computer room units and the heat pumps
- Direct Digital Controls provide accurate temperature control, minimizing drift, and overshoot; heating signals are "pulsed" to exactly match load requirements