jump to home page

Quadrant East Campus Corporate Park Parcel 3-A

Project:

  • 72,000 ft2 3-story Building

Site Location:

  • Federal Way, WA

Team:

  • Owner - Quadrant Corporation
  • Architect - Lance Mueller and Associates
  • GC - GLY Construction Co.
  • HVAC - PSF Mechanical, Inc.
  • Electrical - Johnson Electric
  • Fire Protection - Patriot Fire Protection

HVAC Systems:

  • Standard temperature variable air volume
  • Series fan induction terminal with VAV and electric heat
  • Series type variable air volume valves for cooling
  • Central toilet exhaust system utilizing a rooftop fan
  • Raised curb sound attenuating system for roof units
  • 100% airside economizers
  • Farr 30% pleated filters

Energy Saving Strategies:

  • Efficient scroll compressors
  • Premium efficiency supply and relief fan motors
  • VAV supply and relief fans for the Trane Intellipak units result in both energy savings and accurate control of duct and building static pressure
  • Gas heating is used for nighttime heating and morning warm-up, reducing the use of electric energy